Serving approximately 13,000 citizens, the Department of Public Works requires a full team to handle the multitude of daily tasks and ongoing projects. This dedicated team has helped to make Havre de Grace a great place to live, work and play!

Public Works Organizational Chart

Project Updates

Paving of Canvasback Drive

The scope of this overall project included reclaiming the existing pavement, applying hot-mix asphalt surface paving, adjusting the underground utilities, removing sidewalks, curbs and gutters and replacing with curbs ramps, repairing/replacing storm inlets, restriping the lines and more. This project is substantially complete though minor follow-up tasks remain. Our thanks to the neighborhood for their cooperation and patience during this project.

Rt. 40/Lewis Lane Water Line

This project included a trenchless installation of approximately 130 linear ft. of 20" welded steel casing across U.S. 40 and installation of approx. 474 linear ft. of 8" ductile iron pipe waterline at Rt. 40 and Lewis Lane. The major part of this project finished ahead of schedule with a few minor tasks to be completed. Our neighbors were most supportive and we thank you!